Colocation, hunted down for you · Free

We hunt capacity.
You pick.

Tell us what you're deploying. Within 24 hours you get a shortlist of data centers that can take it, with real rates and move-in dates.

See a sample →

Free, always2 minutesNo calls until you ask

A NexusLink company

High-density GPU racks with rear-door cooling
GPU & high-density
5 to 100 kW a rack, single racks included
Hot aisle in a colocation data hall
Racks & cabinets
From 1U to full cabinets, carrier-neutral
Substation beside a data center campus at dusk
Powered sites
Land and shells at megawatt scale
Private caged suite inside a data center
Cages & suites
Private cages and multi-rack pods

ColoHunter in numbers

500+operators we can put your request in front of
20+years working directly with data centers
24hfrom your request to a priced shortlist
$0cost to you. The operator pays us.

You'll know these names. We also know the ones you won't find on Google.

Why now

The good space is gone before it's listed.

1.4%

of capacity in the major markets is open. That's a record low.

80.4%

of what's under construction is already spoken for.

2028

is the delivery date most buyers are signing for today.

Every week you spend filling out contact forms, someone else takes the slot. We already know who has power, where, and when.

SourcesCBRE, North America Data Center Trends H1 2026 · JLL North America Data Center Report, Aug 2026

What you get

This lands in your inbox.

  • Real numbers. Rates, power and move-in dates. Never "contact sales."
  • Side by side. Every option quoted the same way, so the cheapest one is actually the cheapest.
  • Your call. You choose who hears from you. Until then, nobody does.
How it works

Two minutes from you. The rest is on us.

01 · You

Tell us the footprint

Space, power, market, timing. Two minutes, no account.

02 · Us

We hunt

We work a network of 500+ operators and keep only the ones that fit.

03 · You

You pick

Compare, choose, sign direct with the operator. Or walk away. Either way you owe us nothing.

What we hunt

From one rack to a whole campus.

Row of server cabinets with perforated doors

Racks and cabinets

A few rack units to full cabinets, in carrier-neutral buildings.

GPU node with direct-to-chip liquid cooling loops

GPU and high-density

15 to 100+ kW a rack, with cooling that's installed, not promised.

Cage door with a biometric access reader

Cages and suites

Private, locked and on A/B power, sized from a few racks up.

Aerial view of a powered data center site

Powered sites

Land, shells and megawatts for AI and HPC.

The big hunt

Need megawatts nobody has listed?

Multi-megawatt, phased, or a pre-buy on space that isn't built yet. Tell us the project and we'll go find it with you.

Who it's for

Pick your situation. See what you get.

The cloud bill grows every quarter, and nobody can forecast it.

You getOne monthly number to hold against your cloud spend, with power, bandwidth, cross-connects and escalators already in it.

The catch

There isn't one.

Operators pay us out of the sales commission they already budget. Your rate is the same as going direct. You just skip the month of phone calls.

No. We use your details only to price your request, and no operator contacts you until you ask for the introduction.

Your shortlist is two minutes away.

Free. No obligation. No calls until you ask.